Kitchen remodel with white oak cabinetry and quartz island
East SacramentoKitchen · 11 weeks
Primary bathroom with curbless shower
Land ParkPrimary bath · 4 weeks
Great room addition with vaulted ceiling
Elk GroveGreat-room addition · 14 weeks
Craftsman exterior renovation
Curtis ParkExterior & siding · 6 weeks
Framing stage of a whole-home renovation
Tahoe ParkWhole-home renovation · 24 weeks
Completed detached accessory dwelling unit interior
CarmichaelDetached ADU, 720 sq ft · 26 weeks
Case studies

Three projects in detail

The same information we would give you in an estimate meeting: what the client wanted, what we found once we opened the walls, and what it cost.

East Sacramento kitchen, 1928 Tudor

Duration 11 weeks · Budget band $95k–$110k

Brief: Remove the wall between a closed kitchen and dining room, keep the period character, and gain a usable island.

Found on opening: The wall was load-bearing and carried a knob-and-tube circuit. We engineered a flush LVL beam and rewired the north half of the house.

Delivered: Custom rift-sawn oak cabinetry, 10 ft quartz island, restored original casings, two days ahead of schedule.

Land Park primary bathroom

Duration 4 weeks · Budget band $38k–$45k

Brief: Replace a leaking 1990s tub-shower with a curbless walk-in shower usable into retirement.

Found on opening: Fifteen years of slow leakage had rotted the subfloor and one joist. Documented, photographed and priced as a $1,840 change order the same day.

Delivered: Sistered joist, new subfloor, bonded waterproof membrane, heated porcelain floor, frameless glass and concealed grab-bar blocking.

Elk Grove great-room addition

Duration 14 weeks · Budget band $175k–$195k

Brief: 420 sq ft addition off the rear of a 2004 tract home, with a vaulted ceiling and sliding doors to the garden.

Found on opening: Existing roof framing could not carry the tie-in as drawn; re-engineered with a ridge beam and two point loads to new footings.

Delivered: Vaulted great room, 12 ft slider, new mini-split zone, finished while the family remained in the home throughout.

By the numbers

What our project book looks like

0

Projects completed since 2009.

0

Handed over on or before the contracted date.

0

Of work comes from referrals and repeat clients.

0

Unresolved CSLB complaints against our licence.

Want to see one in person?

Several past clients are happy to host a walkthrough of finished work. Ask us during your estimate and we will arrange it.